Feel free to ask questions via the contact form below

Production FacilityPrint page


At our production facility, located in Central Eastern Poland 140 km. from Warsaw, we possess modern production lines for various types of packaging.

We fill beverages into cans of many formats, PET bottles of various sizes.

Our infrastructure includes production lines which apply sleeves to cans and bottles, as well as lines for packing plastic and cardboard multi-packs.

Production Facility

Production Facility

Highest Water Quality

Our beverage bottling plant is equipped with a water treatment station and possesses its own deep-well intake.
The water supply system is based on reverse osmosis (RO). Importantly, it is able to efficiently regulate the hardness of the water, depending on recipe requirements for the beverages being produced (0°DH - 6°DH).

The saturation process follows the American system - finished beverages are carbonated independently on all lines.


We have more than 10,000 sqm. of warehouse space.

This enables us to offer our clients not only production services, but also beverage storage.

Loading takes place at four docks simultaneously, which significantly reduces waiting time.

Production Facility